Row 2:
Begin row 2 at the left hand side with half a panel, again with the 2 end lugs pointing left as the first row. Then fit full panels with the 2 end lugs all pointing right, and complete the row with another half panel.
Edging: Start to lay the edging when row one is completed. The edging then acts as a "straight edge" and ensures each row is square and flush as it is laid.
Fit the edging by pushing the lugs underneath the panels at an angle, and then lower to the floor, in the same manner as when laying the panels, DO NOT force them down.
Half-length and full-length edges are supplied so that the panel joints and the edging joints never coincide, i.e they follow the same overlapping brickwork pattern. NB: The corners are always positioned on the sides of the floor as shown below and never on the top (i.e of row 1)

Row 3:
Lay with full panels as row one.
Row 4:
Start and finish with half panels as row two.
Continue alternating rows and fitting edges as above until the floor is laid.
PLEASE NOTE:
The flooring, being made partially from natural wood, should be stored in a well-ventilated atmosphere, and never in a hot dry place.
Need Help?
Call us on 01509 673753 for immediate help! |